BAA Edinburgh Airport
WH Smith
Works consisted of the removal of existing finishes, fittings and wall linings along with a ont glazed shopfront. The works were carried out over day & night shift for a duaration of 3 weeks.
Check-in Desk
The work involved the addition of a new check-in desk and installation of a new out of gauge desk for over sizes baggage. This work was classed as AIR SIDE and our team & subcontractors were put through rigorous H&S training which included a fire safety training course, with the airport fire fighters and a security awareness course.
Passanger Departure Toilets
Renovating the toilets in the main terminal entailed working in a live environment where the passengers required access whilst works were carried out during the day.